info@epok.com.tr

OFFER
Establish Of Geodetic Network Along Railways In Total 520 Km
Buradasınız: HOMEPAGE / Projects
Establish Of Geodetic Network Along Railways In Total 520 Km
PROJE ADI
Establish Of Geodetic Network Along Railways In Total 520 Km
BMD Engineering / The Republic Of Turkey State Railways (TCDD)
Konya-Karaman-Mersin-Ulukışla-Niğde-Kayseri
ESTABLISH OF GEODETIC NETWORK
BAŞLAMA : 18 Şubat 2009
BİTİŞ : 27 Mayıs 2009

* Determination of the location of the ground control points according to the flight plan.

* Construction of First, Second and Third order ground control points monuments in designated Places.

* Signalation of Ground Control Points within the standards of General Directorate of Land Registry and Cadastre (TKGM)

* Carring out GPS Static Measurements of Ground Control Points and concluding the calculations

* Preparations of Calculation Reports, Ground Control Description Cards to be approved by General Directorate of Land Registry and Cadastre (TKGM)